Power boost for power and data connectivity micro grids for information and communication technology infrastructure and related methods and devices

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12107429
SERIAL NO

17380866

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power and data connectivity micro grid for Information and Communication Technologies (ICT) infrastructure includes power sourcing equipment device configured to deliver a first direct current (DC) power signal to a power port of the power sourcing equipment device, a power boost module having a power input port and a power output port, where the power boost module is configured to add a DC boost power signal to a second DC power signal received at the power boost module, a first splice enclosure, a second splice enclosure, and first, second and third composite power-data cables configured to transmit first, second, and third DC power signals. The third DC power signal from the power output port of the power boost module includes the DC boost power signal added to the second DC power signal that was received at the power input port of the power boost module.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
OUTDOOR WIRELESS NETWORKS LLC3642 E US HIGHWAY 70 CLAREMONT NC 28610

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Craft,, Jr Thomas F Murphy, US 19 43

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 1, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 1, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 1, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00