Power device and manufacturing method thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12107160
APP PUB NO 20220376110A1
SERIAL NO

17726515

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power device includes: a semiconductor layer, a well region, a body region, a gate, a sub-gate, a source, a drain, and an electric field adjustment region. The sub-gate is formed above a top surface of the semiconductor layer, wherein a portion of the well region is located vertically beneath the sub-gate. The sub-gate is not directly connected to the gate. The electric field adjustment region has a conductivity type which is opposite to that of the well region. The electric field adjustment region is formed beneath and not in contact with the top surface of the semiconductor layer. The electric field adjustment region is located in the well region of the semiconductor layer, and at least a portion of the electric field adjustment region is located vertically beneath the sub-gate.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
RICHTEK TECHNOLOGY CORPORATIONZHUBEI

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chen, Chu-Feng Hsibchu, TW 20 38
Chiu, Chien-Wei Yunlin, TW 46 125
Huang, Chien-Hao Penghu, TW 86 202
Lo, Kuo-Hsuan Taoyuan, TW 11 29
Weng, Wu-Te Hsibchu, TW 26 39

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 1, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 1, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 1, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00