Method and apparatus for real-time learning-based augmented irradiation control and optimization

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12106865
APP PUB NO 20210358647A1
SERIAL NO

17236852

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A machine-learning tool learns from sensors' data of a nuclear reactor at steady state and maps them to controls of the nuclear reactor. The tool learns all given ranges of normal operation and responses for corrective measures. The tool may train another learning tool (or the same tool) that forecasts the behavior of the reactor based on real-time changes (e.g., every 10 seconds). The tool implements an optimization technique for differing half-life materials to be placed in the reactor. The tool maximizes isotope production based on optimal controls of the reactor.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GEORGETOWN UNIVERSITY37TH & O STREETS N W WASHINGTON DC 20057

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Frieder, Ophir Washington, US 190 3727
Gomez, Fernandez Mario Enrique Corvallis, US 2 1
Reese, Steven R Corvallis, US 4 9

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 1, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 1, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 1, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00