Methods and apparatus to monitor and manage loading docks and facility operations

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12106621
APP PUB NO 20210082220A1
SERIAL NO

16979416

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Methods and apparatus to monitor and manage loading docks and facility operations are disclosed. An example apparatus includes a data analyzer to: monitor first data indicating whether a truck trailer is present at a dock of the material handling facility; and monitor second data indicating a condition associated with a door at the dock, the second data being different than the first data. The apparatus further includes a notification generator to generate a notification based on the first data and the second data.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
RITE-HITE HOLDING CORPORATION195 S RITE-HITE WAY MILWAUKEE WI 53204

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Boerger, James C Franksville, US 29 901
Bowman, Kenneth C Cedarburg, US 11 155
Jeffers, John Franklin, US 8 415
Mews, Richard Bonduel, US 15 375
Peschel, Brian J Saukville, US 2 18
White, Adam River Hills, US 43 1198
Wurster, Kyle Richfield, US 2 18
Yerramsetty, Viswa Teja Mountain View, US 2 18

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 1, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 1, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 1, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00