Combined hydrogen storage - compression system for the filling of high pressure hydrogen tanks

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12104751
SERIAL NO

17601824

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present relates to a combined hydrogen storage-compression unit suitable for the filling of high-pressure (350 bar and beyond) hydrogen vessels. It includes a containment vessel filled with a hydrogen storage alloy, a heating system, a cooling system and a thermal management system. The same shall be connected directly to the hydrogen supply (e.g. an electrolyser) on one side and to the end consumer on the other side. Moreover, it offers the possibility for intermediate storage of at least one time the maximal quantity of hydrogen that is to be supplied at high pressure in a single step.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ECOLE POLYTECHNIQUE FEDERALE DE LAUSANNE (EPFL)EPFL-TTO EPFL INNOVATION PARK J LAUSANNE CH-1015

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Gallandat, Noris Schwarzsee, CH 11 1
Züttel, Andreas Sion, CH 5 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 1, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 1, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 1, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00