Soft-to-hard goods connections with dynamic energy dissipation enhanced through friction

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12104674
SERIAL NO

18421520

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A soft-to-hard goods connector is provided which includes an elastomeric bladder having a preform layer and an outer textile layer enclosing the preform layer. The outer textile layer has at least one skin extension layer extending beyond a periphery of the elastomeric bladder. The skin extension layer has a chord attached at a distal end with the chord being perpendicular to the skin extension layer. The connector includes a host rigid structure with a receiving component. The receiving component has a mounting track with the chord mounted in the mounting track. The receiving component permits the chord to rotate about a longitudinal axis of the chord with a limited range of motion.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
THE GOVERNMENT OF THE UNITED STATES OF AMERICA AS REPRESENTED BY THE SECRETARY OF THE NAVY875 NORTH RANDOLPH STREET SUITE 1425 ARLINGTON VA 22203

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cavallaro, Paul V Raynham, US 25 205
Matson, Megan A Virginia Beach, US 2 0
Schleicher, Christine C Virginia Beach, US 2 0
Smith, Michael P Warwick, US 77 895

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 1, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 1, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 1, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00