System and method for processing recycled asphalt pavement or aggregate for asphalt production

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12104333
SERIAL NO

17108790

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In a system and method for processing recycled asphalt pavement or aggregate for asphalt production, a heating and drying unit includes a trough positioned within an external housing. A hollow auger is positioned in the trough, such that the recycled asphalt pavement or aggregate received at a first end of the trough is transported to a second end of the trough via rotation of the hollow auger. The trough is constructed of two or more sections to allow for thermal expansion, with only one end of each of the two or more sections connected to the external housing. Heated air is introduced into the trough via an inlet and exits the trough via an outlet. Heated oil is pumped through the hollow auger, entering via an inlet and exiting via an outlet. The heated air and heated oil raise the temperature of the recycled asphalt pavement or aggregate.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
RELIABLE ASPHALT PRODUCTS INCP O BOX 519 SHELBYVILLE KY 40066

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Dixon, Brian Neal Mt. Washington, US 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 1, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 1, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 1, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00