Oil-well metal pipe, and method for producing oil-well metal pipe

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12104085
APP PUB NO 20230312946A1
SERIAL NO

18041829

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An oil-well metal pipe according to the present disclosure has a pipe main body including a first end portion and a second end portion. The pipe main body includes a pin formed at the first end portion, and a box formed at the second end portion. The pin includes a pin contact surface including an external thread part, and the box includes a box contact surface including an internal thread part. The oil-well metal pipe according to the present disclosure also includes a resin coating containing a resin, a solid lubricant powder, and copper phthalocyanine on or above at least one of the pin contact surface and the box contact surface.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NIPPON STEEL CORPORATIONTOKYO JAPAN
VALLOUREC OIL AND GAS FRANCE54 RUE ANATOLE FRANCE AULNOYE-AYMERIES 59620

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Abe, Tomoka Tokyo, JP 4 1
Matsumoto, Keishi Tokyo, JP 32 384
Ochiai, Mamoru Tokyo, JP 2 0
Tomiyasu, Ken Tokyo, JP 4 14

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 1, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 1, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 1, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00