Air conditioning system, transportation system including the same, and associated method

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12103354
SERIAL NO

18612010

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An air conditioning system is provided. The system includes an air compressor configured to pull in ambient air and generate pressurized air from the ambient air, a blower, a generator, and a turboexpander. The turboexpander is coupled to the air compressor, the blower, and the generator. The turboexpander includes a turbine wheel configured to generate boosted air from the pressurized air from the air compressor, and an expander wheel coupled to the turbine wheel and configured to: a) generate expanded and cooled air from the boosted air, and b) create mechanical work in the generator in order to generate electricity for powering the air compressor and/or an electrical apparatus. The blower is configured to receive the expanded and cooled air from the turboexpander and deliver the expanded and cooled air to an environment.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
THEVU LLC7280 SUMMER HILL DRIVE CONCORD TOWNSHIP OH 44077

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Primbas, George Concord Township, US 2 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 1, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 1, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 1, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00