Laminating system, insert injection system including laminating process, laminating method, and insert injection method including laminating process

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12103259
SERIAL NO

18501359

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A laminating system, an insert injection system including a laminating process, a laminating method, and an insert injection method including the laminating process, which can enhance adhesive force between a metal sheet made of a SUS material and plastic resin, which are raw materials for injection-molded products, such as automobile window moldings, when the injection-molded products are manufactured, are described. The present system can enhance adhesive force between a metal sheet made of a SUS material and plastic resin through introduction of film-type adhesive and dedicated adhesive equipment, which are raw materials for injection-molded products, such as automobile window moldings, when the injection-molded products are manufactured, and can save labor costs generated due to manual work by workers and improve the workshop environment (e.g., the unique smell of solvent-type bond/contamination).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
LEE JUNG SOOBUSAN

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lee, Jung Soo Busan, KR 36 111

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Apr 1, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Apr 1, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 1, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00