Power-forwarding bridge for inter-chip data signal transfer

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12100662
SERIAL NO

17127304

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An integrated circuit (IC) package, comprising a substrate that comprises a bridge die embedded within a dielectric. A first die comprising a first input/output (I/O) transmitter and a second die comprising a second I/O receiver and electrically coupled to the bridge die. A first signal trace and a first power conductor are within the bridge die. The first signal trace and the first power conductor are electrically coupled to the first I/O transmitter and the second I/O receiver. The first signal trace is to carry a digital signal and the first power conductor to provide a voltage for the second I/O receiver to read the digital signal.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
INTEL CORPORATION2200 MISSION COLLEGE BOULEVARD SANTA CLARA CA 95054

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Burton, Edward Hillsboro, US 29 371
Krueger, Daniel Fort Collins, US 9 55
Pasdast, Gerald San Jose, US 43 167
Qian, Zhiguo Chandler, US 88 774
Wang, Peipei San Jose, US 31 55

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 24, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 24, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 24, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00