Projector

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12098812
SERIAL NO

18651674

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention discloses a projector, including: a fastening base; an electric motor assembly, and a light source assembly, component are fastened to the fastening base; a first optical element, driven by the electric motor assembly, the first optical element is selected from at least one of the following types of optical elements: slides, condensing lenses or corrugated pieces; and light emitted by the light source assembly passes through the first optical element; and a second optical element, located above the first optical element, wherein the first optical element is located in a range of 1F-2F of the second optical element; and the second optical element is selected from at least one of the following types of optical elements: multi-section lenses, convex lenses or irregular elongated lenses.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HE JIEQIONGRM 705 BLDG 18 MINGHUIHAO HUWAN GARDEN NO 8 HONGLING 4TH RD SHISHAN TOWN NANHAI DIST FOSHAN 528200

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Li, Jialin Zhuhai, CN 42 132

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 24, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 24, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 24, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00