Joint member, method for producing joint member, and method for connecting flexible tube to joint member

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12098791
APP PUB NO 20240102591A1
SERIAL NO

17768306

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A joint member includes a joint main body configured to include a flow path portion formed and an opening portion communicating with the flow path portion, and a tube member configured to include an end portion inserted into the opening portion of the joint main body and joined to the joint main body by brazing. The joint main body includes a step portion on which the end portion of the tube member inserted into the opening portion abuts. The tube member includes an annular recessed portion recessed from an outer peripheral surface of the tube member and formed on a flexible tube side with respect to an end surface on a joint main body side.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NEC PLATFORMS LTD2-6-1 KITAMIKATA TAKATSU-KU KAWASAKI-SHI KANAGAWA 213-8511

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Nakamura, Yasuhito Kanagawa, JP 12 61

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 24, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 24, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 24, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00