Electricity storage device management computer for a construction machine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12098522
APP PUB NO 20200399856A1
SERIAL NO

16978498

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A management server receives a maximum value and a minimum value of the respective voltages in a plurality of battery cells configuring an electricity storage device of a hydraulic excavator from the hydraulic excavator, and stores the values in a storage device. Discharge characteristics of the electricity storage device are stored in the storage device in the management server. A battery state estimation calculating unit in the management server calculates an estimation maximum value and an estimation minimum value of cell voltages in the present or in the future by adding the discharge characteristics stored in the storage device to the latest maximum value and the latest minimum value of the cell voltages stored in the storage device. A management information producing unit outputs information based upon the estimation maximum value and the estimation minimum value of the cell voltages calculated in the battery state estimation calculating unit.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HITACHI CONSTRUCTION MACHINERY CO LTDTOKYO JAPAN

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Naya, Itaru Tsuchiura, JP 8 23
Takeuchi, Ken Kasumigaura, JP 169 6391
Watanabe, Akira Ushiku, JP 324 4667

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 24, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 24, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 24, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00