Gypsum board containing a polyol compound

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12098103
APP PUB NO 20220274879A1
SERIAL NO

17680467

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention is directed to a gypsum board and a method of making such gypsum board. For instance, the gypsum board comprises a gypsum core, a first facing material, and a second facing material wherein the first facing material and the second facing material sandwich the gypsum core. The gypsum core comprises a first gypsum core section and a second gypsum core section each comprising gypsum, wherein the first gypsum core section comprises a polyol compound and has a density higher than a density of the second gypsum core section.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • GOLD BOND BUILDING PRODUCTS, LLC

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bailey, Joseph J Charlotte, US 49 29
Burgess, Elizabeth Matthews, US 2 0
Busche, Bradley J Shelby, US 19 10
Iyer, R G Charlotte, US 24 5
Stav, Eli Charlotte, US 42 97
Whittington, Gene Fort Mill, US 7 4

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 24, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 24, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 24, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00