Pillar-shaped semiconductor device and manufacturing method thereof

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12096608
SERIAL NO

17493251

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In a SRAM cell, a Si pillar, which is a selection SGT in upper row of Si pillars, is located on the left end in X direction. A Si pillar, which is a selection SGT in lower row of Si pillars, is located on the right end. The Si pillar of the lower row is present in a width of an area extended from a contact hole in Y direction in planar view. Then, the Si pillar of the upper row is present in a width of an area extended from a contact hole in Y direction in planar view. In each of the upper row and the lower row, a TiN layer, which is a gate electrode for a loading SGT and a driving SGT, is formed to contact at side surface of entire gate region in a vertical direction between the corresponding Si pillars.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
UNISANTIS ELECTRONICS SINGAPORE PTE LTDSINGAPORE 179098

International Classification(s)

  • No Non-US Classification to display

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Harada, Nozomu Tokyo, JP 261 1653
Li, Yisuo Singapore, SG 27 310
Masuoka, Fujio Tokyo, JP 412 6771

Cited Art Landscape

Load Citation

Patent Citation Ranking

  • No Patent Citation Ranking to display

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 17, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 17, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 17, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00