Method of forming nitride semiconductor film

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12094710
APP PUB NO 20210217618A1
SERIAL NO

17219320

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The method of forming a nitride semiconductor film includes intermittently sputtering a target of gallium nitride inside a vacuum chamber containing nitrogen and argon, and depositing sputtered particles of the gallium nitride that are scattered from the target inside the vacuum chamber, on a substrate having a temperature of 560 degrees C. or higher and 650 degrees C. or lower. A ratio of a flow rate of the nitrogen to a sum of the flow rate of the nitrogen and a flow rate of the argon supplied to the vacuum chamber is 6% or higher and 18% or lower.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TOKYO ELECTRON LIMITEDTOKYO 107-6325
OSAKA UNIVERSITYSUITA-SHI OSAKA 565-0871

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Imanishi, Masayuki Osaka, JP 73 690
Katayama, Ryuji Osaka, JP 7 0
Miura, Hitoshi Tokyo, JP 27 696
Mori, Yusuke Osaka, JP 205 925
Neishi, Koji Nirasaki, JP 19 228
Takahashi, Nobuaki Tokyo, JP 244 3312

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 17, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 17, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 17, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00