Air supply duct for fan and combustion device including the same

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12092253
SERIAL NO

17518562

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An air supply duct for fan is used to guide air to an air intake port of a fan, and includes a duct main body portion in which an air passage extending in a predetermined x direction with one end side set as an air inlet port is formed inside, and an air supply port for supplying air travelling through the air passage to the air intake port of the fan is arranged. A peripheral region of the air supply port of the inside of the duct main body portion is surrounded by wall portions in the periphery except for a communication portion with the air passage, and is configured as a space portion for generating air column vibration and having a width in a y direction intersecting the x direction larger than a width of the air passage. A combustion device including the air supply duct is provided.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NORITZ CORPORATION93 EDOMACHI CHUO-KU KOBE-SHI HYOGO 650-0033

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fukunishi, Keigo Hyogo, JP 11 146

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 17, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 17, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 17, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00