Lined butterfly valve and method for manufacturing lined butterfly valve

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12092224
APP PUB NO 20230008981A1
SERIAL NO

17787682

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A lined butterfly valve and manufacturing method, the lined butterfly valve including a valve disk (2) with a core metal (20) covered with a lining layer (22) provided rotatably inside a body (3) by a stem (5). The lining layer includes a front/back-side lining part (32) provided on each of front and back sides of the core metal and an outer circumferential lining part (33) provided on an outer circumferential side of the core metal. The front/back-side lining part is provided on each of the front and back sides of the core metal in which no occurrence of warpage is assumed so as to have a thickness T1, and the outer circumferential lining part has a thickness T2 from an outer circumferential end of the core metal to a tip seal surface of an outer circumferential end of the valve disk.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KITZ CORPORATIONCHIBA COUNTY JAPAN

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Muneyoshi, Takanori Chino, JP 2 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 17, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 17, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 17, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00