Lubricant change system for power transmission equipment

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12091996
SERIAL NO

16445575

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A mobile vehicle lubrication unit for serving power transmission equipment elevated above ground level such as conveyors whereby the lubricant containing gear reducer unit is disposed in an enclosed body mounted on an upper portion of an elevated conveyor. The system includes a manifold system connectable to trailer mounted storage tanks for lubricants, pumps, filters, air supplies and supply lines, and transfer means mounted on a truck or trailer including side access to the control panel and transfer hoses enabling the user to transfer lubricants to elevated equipment such as conveyors by pulling along side of same. The device changes, filters, and replaces the oil in a reducer gearbox or other lubricant containing equipment which is not easily accessed from the ground level. Air presssure is used to evaculate used oil from the conveyor gear motor and/or reducer units and replaces the used oil with filtered or new oil through oil lines and hoses with quick disconnects which may be positioned on a manifold at ground level having oil lines in fluid communication with the gear motor/reducer unit.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HORN JAMES DAWSONLOUISVILLE KY

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Horn, James Dawson Louisville, US 1 2
Koppelman, William Oconomowoc, US 1 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 17, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 17, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 17, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00