Bio-multi-reactor hydrogen generation method and system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12091621
APP PUB NO 20240117258A1
SERIAL NO

18476492

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A bio-multi-reactor hydrogen generation method using a bio-multi-reactor hydrogen generation system including a plurality of carbonization-water gasification furnaces and a plurality of heating furnaces arranged alternately side by side includes: arranging solid combustibles in each carbonization-water gasification furnace; dry distilling the solid combustibles by heating from each heating furnace adjacent to each carbonization-water gasification furnace; gasifying carbide obtained by dry distillation within each carbonization-water gasification furnace by supplying steam to the carbide to cause a water gasification reaction to take place; and maintaining each heating furnace at a temperature for dry distilling the solid combustibles in each carbonization-water gasification furnace by collecting a combustible gas generated in dry distillation of the solid combustibles in each carbonization-water gasification furnace in a tank and supplying the combustible gas to each heating furnace for combustion.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TAKAHASHI KOZONSOSA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Takahashi, Kozon Sosa, JP 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 17, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 17, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 17, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00