Structural impact assembly and vehicle having structural impact assembly

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12090957
APP PUB NO 20230096529A1
SERIAL NO

17489251

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A structural assembly for use in a motor vehicle includes a rocker and a running board. The motor vehicle includes a vehicle frame and a door. The rocker extends in a longitudinal direction of the motor vehicle. The running board is movably coupled to the vehicle frame between a deployed position and a stowed position in which an upper portion of the running board extends vertically above the rocker. The running board is configured to be positioned underneath the door and substantially flush with a lower portion of the door when the door is in a closed position and the running board is in the stowed position.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FORD GLOBAL TECHNOLOGIES LLC1 AMERICAN RD FL4 DEARBORN MI 48126-2701

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Acosta, Flores Alejandro Eli Toluca, MX 3 1
De, Labastida Alonso Huixquilucan, MX 1 1
Herrera, Esquibel Ulises T Coyotepec, MX 2 13
Mendoza, Hernández Diego Eduardo Mexico City, MX 3 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 17, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 17, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 17, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00