Method and controller for controlling the flow of electrical power in a working vehicle

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12090859
SERIAL NO

17439896

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The disclosure relates to a method for controlling a flow of electrical power between an electrical energy source and at least two electric machines of a working vehicle. In one step, an electrical power which can be drawn from the energy source is determined. In a further step, at least two electrical powers which are required for the at least two electric machines are determined. In yet another step, the electrical power which can be drawn is distributed to the at least two electric machines in the ratio of the at least two required electrical powers, such a distribution being carried out if the sum of the at least two required electrical powers is greater than the electrical power which can be drawn. The disclosure also relates to a controller for carrying out the described method and to a working vehicle having such a controller.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ZF FRIEDRICHSHAFEN AG88038 FRIEDRICHSHAFEN

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bebeti, Migen Munich, DE 13 10
Glöckner, Rico Pocking, DE 15 10
Legner, Jürgen Friedrichshafen, DE 23 47

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 17, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 17, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 17, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00