Roof top air conditioner unit, methods for producing, assembling and installing the roof top air conditioner unit and vehicle with the roof top air conditioner unit

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12090811
APP PUB NO 20230166576A1
SERIAL NO

18158786

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A roof top air conditioner unit for a vehicle, in particular a recreational vehicle, wherein the roof top air conditioner at least in part is made of expanded polypropylene (EPP). At least one stabilizing and/or connecting element of the roof top air conditioner unit is mold in the section of the roof top air conditioner unit made of EPP. Furthermore, the present invention refers to a method for producing, assembling and installing such roof top air conditioner units and a vehicle having such a roof top air conditioner assembly.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DOMETIC SWEDEN ABHEMVÄRNSGATAN 15 SOLNA SE-171 54

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chen, Jianmin JinWan, CN 102 1674
Liu, Louis JinWan, CN 34 850

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 17, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 17, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 17, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00