Structural and/or acoustic panel of a nacelle of an aircraft propulsion assembly and related manufacturing method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12090741
APP PUB NO 20200300196A1
SERIAL NO

16800286

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A panel for a nacelle of an aircraft propulsion assembly includes two skins and a cell structure provided with transverse partitions defining cells. The cell structure includes folds with at least one central part forming at least one part of at least one transverse partition and at least one peripheral part extending along at least one of the skins. A nacelle with such a panel is provided, as well as a method for manufacturing such a panel.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAFRAN NACELLESROUTE DU PONT VIII 76700 GONFREVILLE-L'ORCHER 76700
SAFRAN CERAMICSLE LE FRANCE LE HAILLAN GIRONDE

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bouillon, Florent Moissy Cramayel, FR 16 68
Delehouze, Arnaud Moissy Cramayel, FR 31 47
Desjoyeaux, Bertrand Moissy Cramayel, FR 57 178
Silva, De Vasconcellos Davi Moissy Cramayel, FR 8 6

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 17, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 17, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 17, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00