Press forming method and shape evaluation method for press formed part

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12090541
APP PUB NO 20230100401A1
SERIAL NO

17799782

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A press forming method for controlling a shape change of a press formed part over time after the press formed part springs back at a moment of a release from a press-forming die includes: a press forming step of press forming a metal sheet into the press formed part by using the press-forming die; a die releasing step of releasing the press formed part, which is press-formed, from the press-forming die; and a post-release die holding step of holding the released press formed part in a forming bottom dead center shape for 30 minutes or more by using the press-forming die.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
JFE STEEL CORPORATION2-3 UCHISAIWAI-CHO 2-CHOME CHIYODA-KU TOKYO 1000011 ?1000011

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fujii, Yusuke Tokyo, JP 179 908
Tobita, Shunsuke Tokyo, JP 12 8
Urabe, Masaki Tokyo, JP 24 31

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 17, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 17, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 17, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00