Material pickup mechanism for automatic hat-making production line equipment

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12089688
APP PUB NO 20230225447A1
SERIAL NO

18009977

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A material pickup mechanism for automatic hat-making production line equipment includes an installation seat, a servo motor, and a rotating seat. A control box is arranged on one side of the installation seat through bolts. The servo motor is arranged at a bottom end of the installation seat through a positioning plate and positioning screw. The rotating seat is arranged at an output shaft of the servo motor through bolts. Top and bottom ends of the rotating seat are both connected with an installation plate through a fixed shaft. Adjusting holes are formed at a top of the installation plate. A hollow screw penetrates the adjusting hole. A bottom of the hollow screw is connected with an air outlet end of at least one sucking disc. The material pickup mechanism can continuously pick up materials to improve production efficiency. It is convenient to adjust positions between sucking discs.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
QINGDAO QIANFENG CAPART INT'L CORPQINGDAO

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Wang, Aimei Qingdao, CN 4 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 17, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 17, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 17, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00