Shrimp processing apparatus and methods

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12089605
APP PUB NO 20230138989A1
SERIAL NO

17795574

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Shrimp processing apparatus to head and optionally sever the mud veins of shrimp, along with methods for heading and mud vein severing are described herein. The shrimp processing apparatus may be provided in systems may include one or more processing stations configured to perform one or more of the following functions on each shrimp: measurement of individual shrimp, severing the mud vein of individual shrimp, and heading of individual shrimp.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • NOVA-TECH ENGINEERING, LLC

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Biel, Matthew R Willmar, US 6 2
Blum, Nathan A Cosmos, US 7 2
Deming, Jeff Spicer, US 5 2
Eid, Elliot D Richmond, US 6 2
Harkess, Roger Willmar, US 4 1
Imdieke, Jeremy Willmar, US 4 1
Johnson, Robert Litchfield, US 196 3200
Molenaar, Dana Mathew Pennock, US 6 14
Remmel, Shaun Willmar, US 3 1
Rooney, Jacob Belgrade, US 7 534
Zinda, Marc Spicer, US 5 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 17, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 17, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 17, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00