Multi-directional energy harvester

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12088219
APP PUB NO 20240048077A1
SERIAL NO

18151557

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An embodiment multi-directional vibration energy harvester includes a fixing part in which fixed discs of a conductive material are stacked spaced apart from each other and electrically connected to each other and a vibration unit in which vibration discs are arranged to be spaced apart from each other with the vibration discs being alternately stacked with the fixed discs, wherein the fixed discs and the vibration discs are arranged so that as an arrangement distance between a vibration disc of the vibration discs and a fixed disc of the fixed discs is changed by an external force, an electron moves between the vibration disc and the fixed disc.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HYUNDAI MOTOR COMPANY12 HEOLLEUNG-RO SEOCHO-GU SEOUL 06797
KIA CORPORATION12 HEOLLEUNG-RO SEOCHO-GU SEOUL 06797

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kim, Dong-Gu Suwon-si, KR 9 20
Kim, Hyun-Soo Yongin-si, KR 219 3596
Kwon, Dae-Sung Seoul, KR 6 36
Lee, Jang-Hyeon Gunpo-si, KR 3 15
Yoo, Il-Seon Suwon-si, KR 2 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 10, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 10, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 10, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00