Battery module

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12087963
SERIAL NO

17436679

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The battery module includes: battery stack including a plurality of batteries that are stacked, each of the plurality of batteries having valve portion; duct plate configured to cover a surface of battery stack on which the plurality of valve portions are disposed, duct plate having gas discharge duct that is connected to valve portions of the respective batteries, and temporarily stores a blown-off gas; cover plate placed on duct plate; and flow path portion defined by duct plate and cover plate, flow path portion extending from gas discharge duct in a first direction that intersects with stacking direction and allowing leaking of the gas in gas discharge duct to an outside of battery module. Cover plate has opening through which a midst portion of flow path portion is communicable with the outside of the battery module.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SANYO ELECTRIC CO LTDJAPAN'S OSAKA MORIGUCHI CITY BEIJING SAKAMOTO 2 D EYES 18 TIMES MORIGUCHI-SHI OSAKA

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Egashira, Takuya Hyogo, JP 22 66
Fujii, Yusuke Hyogo, JP 179 908
Takeda, Nao Hyogo, JP 8 41
Unehara, Takuya Hyogo, JP 3 26
Yoshida, Naotake Hyogo, JP 36 126

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 10, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 10, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 10, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00