Epicyclic gear train

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12084978
APP PUB NO 20230304416A1
SERIAL NO

18196048

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A gas turbine engine according to an example of the present disclosure includes, among other things, a propulsor section including a propulsor supported on a propulsor shaft, a turbine section including a turbine shaft, a compressor section having a plurality of compressor hubs with blades driven by the turbine shaft about an engine axis, and an epicyclic gear train interconnecting the propulsor shaft and the turbine shaft. The epicyclic gear train includes a sun gear coupled to the turbine shaft, intermediary gears arranged circumferentially about and meshing with the sun gear, a carrier and a ring gear including first and second portions. The first and second portions have axially opposed faces abutting one another at a radial interface.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
RTX CORPORATION10 FARM SPRINGS ROAD FARMINGTON CT 06032

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
McCune, Michael E Colchester, US 268 6476
Portlock, Lawrence E Bethany, US 56 1093
Schwarz, Frederick M Glastonbury, US 446 5139

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 10, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 10, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 10, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00