Method for devatting the grape harvest and means for devatting a grape harvest

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12084638
SERIAL NO

16970825

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for devatting the grape harvest and a device for devatting a grape harvest via the pressurized injection of air or other gases in a controlled manner into self-emptying wine making vats or similar, for the purpose of emptying the grape harvest once the maceration thereof has been completed, after the homogenization of the mixture, transferring the liquid portion to another tank and the crushed grape pulp to the press, thereby obtaining a solid phase (pomace) as a waste product which can be used to produce associated products.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PRODUCTOS AGROVIN S A13600 ALCAZAR DE SAN JUAN - CIUDAD REAL

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Iniesta, Ortiz Juan Alberto Alcazar de San Juan, ES 4 0
Jurado, Fuentes Ricardo Alcazar de San Juan, ES 4 0
Manzanero, Fernandez Irene Alcazar de San Juan, ES 2 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 10, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 10, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 10, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00