Tubular rotary component, manufacturing method therefor, and mold therefor

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12083573
SERIAL NO

17426912

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided is a method for manufacturing a tubular rotary component from a donut-shaped metal disc, wherein the generation of wrinkles or cracks due to a drawing process can be suppressed. This method for manufacturing a tubular rotary component 100B includes: an intermediate molding step in which the entirety of both surfaces of a donut-shaped metal disc 100 having a prescribed inner diameter D1 and outer diameter D2 are pressed by the respective tapered surfaces of a punch 10A and a die 20A provided with a prescribed taper to carry out bore-expansion drawing, thereby obtaining a frustoconical intermediate molded article 100A; and a final molding step in which the intermediate molded article 100A is pressed by a punch 10B and a die 20B having a desired shape to carry out bore-expansion drawing again, thereby obtaining a tubular rotary component 100B.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NIPPON STEEL CORPORATION6-1 MARUNOUCHI 2-CHOME CHIYODA-KU TOKYO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kitora, Takatsugu Tokyo, JP 7 34
Sugama, Atsushi Tokyo, JP 8 22

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 10, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 10, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 10, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00