Methods and systems for semantic scene completion for sparse 3D data

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12079970
APP PUB NO 20230105331A1
SERIAL NO

17492261

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Methods and systems for performing semantic scene completion of sparse 3D data are described. A frame of sparse 3D data is preprocessed into a sparse 3D tensor and a sparse 2D tensor. A partially completed 3D tensor is generated from the sparse 3D tensor using a 3D prediction network, and a semantically completed 2D tensor is generated from the sparse 2D tensor using a 2D prediction network. The partially completed 3D tensor is completed to obtain a semantically completed 3D tensor by assigning a given class label, which has been assigned to a given pixel in the semantically completed 2D tensor, to a voxel at a corresponding x-y coordinate in the partially completed 3D tensor.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HUAWEI TECHNOLOGIES CO LTDSHENZHEN

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Agia, Christopher George-R Stouffville, CA 2 1
Cheng, Ran Shanghai, CN 15 23
Liu, Bingbing Markham, CA 39 104
Ren, Yuan Thornhill, CA 46 181

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 3, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 3, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 3, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00