Light source for plant cultivation and plant cultivation device

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12078302
SERIAL NO

17475937

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A plant cultivation light source includes a substrate and a first group of light sources. The first group of light sources includes a plurality of light sources disposed on the substrate, and a light source including a light emitting structure including a first semiconductor layer, an active layer, and a second semiconductor layer. The plurality of light sources operates to emit lights having different wavelength bands and includes a first light source that emits first light having an area of at least about 55% compared with an area of a normalized solar spectrum, a second light source that emits second light having a wavelength for cryptochrome, and a third light source that emits third light having a wavelength for phytochrome.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SEOUL VIOSYS CO LTDANSAN-SI GYEONGGI-DO 15429

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kim, Jin Won Gyeonggi-do, KR 138 698
Kim, Se Ryung Gyeonggi-do, KR 25 43
Ko, Sang Min Gyeonggi-do, KR 25 52
Koo, Jong Hyeon Gyeonggi-do, KR 4 41
Song, Hyun Su Gyeonggi-do, KR 31 67

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 3, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 3, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 3, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00