Vehicle with electric power supply control

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12078139
APP PUB NO 20230151787A1
SERIAL NO

17981797

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A vehicle includes a first power system, a second power system, a switching relay, and a relay controller. The first power system is coupled to an engine restart motor. The second power system is provided independently of the first power system and is coupled to a starter and an accessory. The coupling state of the switching relay is switchable to an on state in which the first power system and the second power system are coupled, and to an off state in which the first power system and the second power system are not coupled. The relay controller is configured to receive a supply of electric power from both the first power system and the second power system and to control the coupling state of the switching relay.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SUBARU CORPORATION1-20-8 EBISU SHIBUYA-KU TOKYO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Inoue, Takashi Tokyo, JP 662 7614
Kobayashi, Tetsuo Tokyo, JP 70 1600
Kurasawa, Shinya Tokyo, JP 4 36
Yoshizawa, Akashi Tokyo, JP 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 3, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 3, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 3, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00