Apparatus for fluid line management in a bioprocessing system

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12077743
SERIAL NO

16968333

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In an embodiment, a tubing module for a bioprocessing system includes a first tubing holder block configured to receive at least one pump tube and hold the at least one pump tube in position for selective engagement with a peristaltic pump, a second tubing holder block configured to receive a plurality of pinch valve tubes and hold each pinch valve tube of the plurality of pinch valve tubes in position for selective engagement with a respective actuator of a pinch valve array, and wherein the first tubing holder block and the second tubing holder block are interconnected.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GLOBAL LIFE SCIENCES SOLUTIONS USA LLC100 RESULTS WAY MARLBOROUGH MA 01752

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Corwin, Alex D Niskayuna, US 15 22
Davis, Brian Michael Niskayuna, US 37 245
Griffin, Weston Blaine Niskayuna, US 76 1131
Keskar, Vandana Niskayuna, US 20 17
Liu, Zhen Niskayuna, US 414 5359
Shaikh, Kashan Niskayuna, US 13 145
Smith, Reginald Donovan Niskayuna, US 42 105
Zhang, Chengkun Niskayuna, US 50 301
Zhang, Xiaohua Niskayuna, US 52 100

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 3, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 3, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 3, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00