Manufacturing process for producing hermetic single-use food containers such as coffee pods, including a creasing step

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12076958
SERIAL NO

17415038

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A manufacturing process for producing hermetic single-use food containers includes: forming a 3D container body having a peripheral upper rim by stamping a 2D blank in a press, the 2D blank including a rim portion and a wall portion; applying a closing lid over the 3D container body and sealing the closing lid with the rim. The manufacturing process is characterized in that it comprises a creasing step before forming the 3D container body, where creases are formed in a peripheral zone of the 2D blank by creasing or embossing the 2D blank with a creasing or embossing plate, the thus pre-creased peripheral zone covering at least a part of the rim portion of the 2D blank.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SOCIETE DES PRODUITS NESTLE S ASWITZERLAND ZUG ZUG

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Gres, Nicolas Echenevex, FR 10 15
Heydel, Christophe Sebastien Paul Chez-le-Bart, CH 28 29
Nordqvist, David Echichens, CH 16 61

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 3, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 3, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 3, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00