Device and method for cutting a continuous fiber 3D printing filament

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12076927
SERIAL NO

17559890

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A device for cutting a filament of a 3D printer includes a blade having a first end and a second end opposite the first end. The device also includes a support that is attachable to a heater block of the 3D printer and supports the blade, such that the blade is movable relative to the heater block. The first end of the blade is a cutting end, and the second end of the blade is a drive end. The drive end of the blade has a surface configured to receive a force from outside of the device, such that the blade moves relative to the heater block.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TCPOLY INC448 RALPH DAVID ABERNATHY BLVD SUITE 10 ATLANTA GA 30312

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bougher, Thomas Coppell, US 2 0
Lloyd, Jacob Atlanta, US 1 0
Myers, Andrew Suwanee, US 6 110
Smith, Matthew Atlanta, US 132 1013

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 3, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 3, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 3, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00