Apparatus and method for the production of buildings

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12076882
SERIAL NO

16833834

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A concrete mixture is forced through a nozzle by an extruder. An applicator has: a body adapted for vertical movement; a primary arm mounted to the body for movement about a vertical axis, the arm being elongate, having ends, having a vertical axis adjacent one end and having a counterweight adjacent the other end; a secondary arm defining a vertical axis, extending from the vertical axis defined by the primary arm and configured for movement about said vertical axis; a tertiary arm mounted for movement along the secondary arm vertical axis; a rotator carried by the tertiary arm and which carries the nozzle and rotates the nozzle about a vertical axis; a primary rotation mechanism for rotating the primary arm about the primary arm axis; an actuator providing for movement of the secondary arm about the vertical axis; and an elevation mechanism providing for said tertiary arm vertical movement.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
I-CUBED INDUSTRY INNOVATORS INC999 BARTON STREET STONEY CREEK ON L8E 5H4

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bunker, Dave Grimsby, CA 2 0
Nichols, Simon Canfield, CA 2 0
Reynolds, Warren Stoney Creek, CA 2 24

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 3, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 3, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 3, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00