Method of removing protein-bound substances by electrically conductive polymer

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12076694
APP PUB NO 20230405532A1
SERIAL NO

18239772

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention provides an organic bioelectronic HD device system for the effective removal of protein-bound substances, comprising PEDOT:PSS, a multiwall carbon nanotube, polyethylene oxide (PEO), and (3-glycidyloxypropyl)trimethoxysilane (GOPS). The composite nanofiber platform exhibited (i) long-term water-resistance; (ii) high adhesion strength on the PES membrane; (iii) enhanced electrical properties; and (iv) good anticoagulant ability and negligible hemolysis of red blood cells, suggesting great suitability for use in developing next-generation bioelectronic medicines for HD.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MING CHI UNIVERSITY OF TECHNOLOGYNO 84 GONGZHUAN RD TAISHAN DIST NEW TAIPEI CITY 243089

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hsiao, Yu-Sheng New Taipei, TW 5 25
Su, Chia-Hung New Taipei, TW 27 107
Yen, Shih-Chieh New Taipei, TW 106 401

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 3, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 3, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 3, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00