Skipping rope, method and device for rope skipping counting

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12076621
SERIAL NO

18391324

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A skipping rope, a method and a device for rope skipping counting are provided. The skipping rope includes: a skipping rope body, a rope skipping counting device, and a position and posture detector rotatably sleeved on the skipping rope body. The position and posture detector is configured to detect position and posture information of the skipping rope body, and the rope skipping counting device is configured to receive the position and posture information and perform rope skipping counting processing according to the position and posture information.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ZHANG PEILINROOM 845 NO 101 BAR 08 ANJU NORTH ROAD GOLMUD CITY HAIXI MONGOL AND TIBETAN AUTONOMOUS PREFECTURE QINGHAI PROVINCE 816000 HAIXI MONGOL AND TIBETAN AUTONOMOUS PREFECTURE QINGHAI PROVINCE 816000

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Zhang, Peilin Beijing, CN 21 26

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 3, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 3, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 3, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00