Sleep control apparatus

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12076494
SERIAL NO

17565644

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A determination section of a sleep control apparatus determines an awakening point based on target data. The target data is time-series data of biological information of a target person in a target period. The target period is a period between wakefulness to failing asleep of the target person, or a period from the wakefulness of the target person to a time point at which a predetermined time has passed since the target person fell asleep. The controller controls a target device so that the target device stimulates the target person to wake up at the awakening point.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DAIKIN INDUSTRIES LTDOSAKA JAPAN

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ashikaga, Tomoyoshi Osaka, JP 9 16
Haikawa, Tomoyuki Osaka, JP 22 144
Imai, Yousuke Osaka, JP 12 82
Kaihotsu, Michiko Osaka, JP 6 28
Murakami, Chizuru Osaka, JP 4 3
Okema, Chiharu Osaka, JP 2 0
Takeuchi, Toshifumi Osaka, JP 122 1431
Ueno, Mizuho Osaka, JP 4 1
Yamada, Shouhei Osaka, JP 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 3, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 3, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 3, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00