Last and shoe upper forming tool

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12075891
APP PUB NO 20230128436A1
SERIAL NO

18048678

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

According to a last, in a forming surface for forming a shoe upper, at least a portion of a specific region corresponding to an upper end portion of a to-be-formed portion of the shoe upper is defined by a plurality of plate-shaped parts included in a plurality of last forming parts. By arranging the plate-shaped parts to be spaced apart from each other in a circumferential direction of an upper end portion of the shoe upper, a portion of the specific region that is defined by the plate-shaped parts is defined by an end surface of each of the plate-shaped parts. A recessed portion as a mark used for alignment with the last during overlaying of the shoe upper is in the portion of the specific region that is defined by the plate-shaped parts.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ASICS CORPORATION1-1 MINATOJIMA-NAKAMACHI 7-CHOME CHUO-KU KOBE-SHI HYOGO 650-8555

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hatano, Genki Kobe, JP 45 57
Kanematsu, Kei Kobe, JP 9 5
Kozuka, Yuya Kobe, JP 32 57
Tanaka, Kimie Kobe, JP 2 9
Wakasugi, Shinsaku Kobe, JP 16 20
Watanabe, Shin Kobe, JP 58 400

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 3, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 3, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 3, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00