Printed circuit board

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12075558
SERIAL NO

17559763

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present disclosure relates to the field of printed circuit board technologies. A printed circuit board with good heat dissipation performance is provided and includes a substrate serving as a board body of the printed circuit board, a heating component embedded in the substrate, and a cooling liquid channel disposed in the substrate. The cooling liquid channel is disposed in the printed circuit board, and passes around the heating component to exchange heat with the heating component, so that a heat dissipation path is shortened and heat dissipation efficiency is improved, thereby quickening heat dissipation of the printed circuit board, and prolonging a service life of the printed circuit board.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HUAWEI DIGITAL POWER TECHNOLOGIES CO LTDSHENZHEN GUANGDONG 518043

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hou, Zhaozheng Dongguan, CN 27 203
Liao, Xiaojing Shanghai, CN 11 200
Shen, Chao Shanghai, CN 68 269
Wang, Dongxing Shanghai, CN 4 7

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 27, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 27, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 27, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00