Method and system for improving boiler effectiveness

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12072096
APP PUB NO 20210285637A1
SERIAL NO

16316170

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for improving effectiveness of a steam generator system includes providing a steam generator system including a steam generator vessel, an air supply system and an air preheater. The air supply system is in communication with the steam generator vessel through the air preheater and the steam generator vessel is in communication with the air preheater. The air supply system provides a first amount of air to the air preheater. At least a portion of the first amount of air is provided to the steam generator vessel. A flue gas mixture is discharged from the steam generator vessel. At least a portion of the flue gas mixture flows into the air preheater. SO3 in the flue gas mixture is mitigated before the flue gas mixture enters the air preheater.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ARVOS LJUNGSTROM LLC3020 TRUAX ROAD WELLSVILLE NY 14895

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Breckinridge, David G Chattanooga, US 1 0
Klingspor, Set Erik Jonas Austin, US 1 0
Mattison, Glenn D Machias, US 13 78
O'Boyle, Kevin Alma, US 4 5

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 27, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 27, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 27, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00