Clamp assembly with a heat protection device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12072058
APP PUB NO 20220316647A1
SERIAL NO

17633698

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A clamp assembly has a clamp with a clamp band and a clamping device for clamping the clamping band and has a heat protection device with a housing and at least one insulating layer. The housing has a respective wall at each axial end face, the wall being divided into sections and protruding radially inwards, and the at least one insulating layer can be positioned between the walls of the housing. The clamp can be surrounded at least in some regions by the housing and/or the at least one insulating layer of the heat protection device, and the heat protection device is designed to be connectable to the clamp.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NORMA GERMANY GMBH63477 MAINTAL

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Geppert, Helmut Maintal, DE 15 257
Krämer, Markus Maintal, DE 3 6
Lantsmann, Natan Maintal, DE 4 11

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 27, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 27, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 27, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00