Conductive laminate and manufacturing method of conductive laminate

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12071557
APP PUB NO 20230220230A1
SERIAL NO

18180135

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Provided is a conductive laminate including a base material and a conductive ink film provided on the base material, in which a region that extends from a position being away from a first main surface toward a second main surface by a distance equivalent to 50% of a thickness of the conductive ink film to the second main surface has a first void ratio of 15% to 50%, and a second void ratio in a region that extends from the first main surface toward the second main surface to a position being away from the first main surface by a distance equivalent to 10% of the thickness of the conductive ink film has a second void ratio which is smaller than the first void ratio.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FUJIFILM CORPORATIONTOKYO 106-8620

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Maeda, Kotaro Kanagawa, JP 11 28
Shimohara, Norihide Kanagawa, JP 29 181

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 27, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 27, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 27, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00