Systems including simulated moving bed separators for high purity fructose production and related methods

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12071451
APP PUB NO 20210347801A1
SERIAL NO

17307609

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of enriching a material comprising glucose, fructose, and one or more components inert to isomerization using chromatography to produce a high purity fructose product. An embodiment of the method purifies high fructose corn syrup from a feedstock into three product streams: a first fraction rich in glucose, a second fructose product comprising an extract of fructose purity exceeding about 95%, and a third less pure fructose fraction comprising fructose ranging from about 55% to about 90% fructose purity. The third less pure fructose fraction may be combined with 42% fructose syrup to produce saleable mid-purity fructose product, such as having 55% fructose purity. An SMB system is also disclosed and comprises a first SMB separator, a second SMB separator, and an isomerization chamber.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
AMALGAMATED RESEARCH LLCP O BOX 228 TWIN FALLS ID 83301

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ferrero,, V Peter Thomas Jerome, US 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 27, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 27, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 27, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00