Method and device for transmitting data by using power line, and method and device for receiving data by using power line

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12068804
SERIAL NO

17457691

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for transmitting data by using a power line. The method includes: setting i=1 and j=1; receiving an i-th zero crossing signal at a time point ti, and determining, based on the i-th zero crossing signal, a start time when synchronization signals of a j-th data packet are transmitted, the start time when the synchronization signals of the j-th data packet are transmitted being ti+t; transmitting the synchronization signals of the j-th data packet at the start time when the synchronization signals of the j-th data packet are transmitted; transmitting data signals of the j-th data packet in sequence; and determining whether j is equal to M; when j is not equal to M, continuing a data transmission; and when j is equal to M, ending the data transmission, M being a number of data packets into which data to be transmitted is divided.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TENDYRON CORPORATIONYU HAITAO ROOM 1810 BLOCK B NO 38 XUEQING ROAD HAIDIAN DISTRICT BEIJING 100083

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Li, Dongsheng Beijing, CN 160 442

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 20, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 20, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 20, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00